km
m
Selected Calibration Item Summary
m/Km
no./Km
%
deg/Km
m/s2
km/h
m
Speed Reduction Factors
0.4 <= XNMT <= 1
0.4 <= XFRI <= 1
0.4 <= XMT <= 1
Surfacing
mm
mm
Previous Works (HDM-4 Work Types)
year
year
year
year
Strength

Calculated Dry season model parameters

SNP
4.61
DEF (mm)
0.56
%
Road Base (for stabilised base only)
mm
GPa
IRI - m/km
%
%
%
%
No./km
mm
mm
mm
SCRIM 50km/h
Shoulders (Concrete only)
m
Drainage
Compaction (Bituminous only)
%
Previous Surface Condition (Bituminous only)
%
%
no/km
Vehicle Fleet used for this section/network: MP Vehicles
2005
Vehicle Class AADT / Count
3 wheeler
Bus
Car
Heavy Truck
Jeep
Light Truck
M/cycle
Medium Truck
Minibus
Tractor
Truck/trailer
Total AADT 359.00
Vehicle Fleet used for this section/network: MP Vehicles
2005
Vehicle Class AADT / Count
Cart
Cycle
Total AADT 123.00
Asset valuation method for Road Pavement Layers
IRI (m/km)
IRI (m/km)
year
Asset Component Replacement Cost (%) Residual Value of asset components (%) Useful Life of asset component (yrs) Age of asset component in year 2005 (yrs)
Road formation & sub-grade
Road pavement layers
Bridges and structures
Traffic facilities / signs
MESAL: Million Equivalent Standard Axle Loads THGmm: Initial gravel thickness All Costs are in Indian Rupee